Infrastructure for intelligence.
Starmason — A joint venture between Sembcorp & BB Holding


Every model, every query,
every national ambition.
Intelligence needs a foundation.
01 / Facility
First light at
Saigon Hi-Tech Park
0 MW
Planned IT capacity · up to, could be expandable
≤ 1.30 PUE
Target energy efficiency
III Tier
Target design standard · up to Tier IV
0 m²
Maximum gross floor area
The forge · Stone to silicon
Masons raised cathedrals from stone.
We raise them from silicon.
The masons who build the stars
02 / The campus
The mason’s drawing · front elevation
Starmason · SHTP · Lot T9H 50.0 m4.46 ha land areaFaçade elevationUp to 90 MW
Planned IT capacity · could be expandable
PUE ≤ 1.30
Target efficiency
Tier III
Target design · up to Tier IV
100,876 m²
Maximum GFA
Fly-through · Conceptual visualization
Façade
Data hall
Cold aisle
Campus
03 / The build
From ground to
first light
December 2026
Project groundbreaking
Planned project groundbreaking.
2027–2028
Construction
Construction will follow project groundbreaking.
1H2029
First commercial operation
Planned commencement of commercial operations.
04 / Location
Wired to the region
Lot T9, Saigon Hi-Tech Park (SHTP), Ho Chi Minh City, Vietnam
10.846° N · 106.794° E
Illustrative regional connections · not measured network performance
In step with Resolution No. 57
Vietnam has set a national direction for science, technology, innovation and digital transformation.
05 / Technical & development highlights
Inside the machine
01
Hyperscale
Designed for hyperscale and carrier-neutral colocation services.
01 · Hyperscale06 / Project overview
Starmason at a glance


- Project Type
- Hyperscale & Carrier-Neutral Data Center
- Land Area
- 4.46 ha
- Building height
- 50 m
- Location
- Lot T9, Saigon Hi-Tech Park (SHTP), Ho Chi Minh City, Vietnam
- Geographic coordinates
- 10.846° N, 106.794° E
- Strategic alignment
- Resolution No. 57 – Science, Technology, Innovation and Digital Transformation
- Planned IT Capacity
- Up to 90 MW, could be expandable
- Target PUE
- ≤ 1.30
- Maximum GFA
- 100,876 m²
- Total Registered Investment
- US$480.3 million
- Project Duration
- 50 years from IRC issuance
- First Commercial Operation
- 1H2029
- Target Design Standard
- Tier III, up to Tier IV (Uptime Institute Tier Classification)